New Page 2
|

Quality
"Your aluminum fencing and gates are of a substantially
higher quality than The Home Depot or Lowes."
Read more
Paul Bonsall
Ft. Pierce,
Florida
|
New Page 2


|
Home > Aluminum Fence - Post Lengths
| | |
|
New Page 8
Additional Post tips &
recommendations
|
Posts are
prepunched based upon
your particular fence/gate configuration. This is an extremely straightforward installation.
Gaps in the
diagrams below illustrate which "sides" of the post are prepunched for fence panel insertion.
OPTION: Don't
forget, you can always use
Wall Mounts (in lieu of a post) to connect one end of any
fence panel to a building, house, column or existing structure.
4 Types of Fence Post
applications
|
1) "IN GROUND" - where the posts will be cemented
INTO the
ground (dirt, grass, etc.),
2) "DECK" - where the posts are going to be mounted ON TOP
of a deck (cement, wood...etc.),
3) "CORE DRILL"
- where you will be using a Core Drill to drill holes in an
existing cement deck or floor, OR
4) "COMBINATION" - where you will be utilizing 2 or more of the
above post application options.
NOTE: Posts used for Deck Applications with Deck Mounts
can easily be cut down on-site during installation.
This is helpful to the installer in that the decision is made on-site
for how much CLEARANCE
there will be between the bottom of all the fence panels / gates and...the ground. |
Grade 1: Residential
Aluminum Fence and Gates
(vertical pickets = 5/8" x
5/8") -
more specs
|
|
Posts
are going "into the ground" |
|
for any
36" high |
mrpl =
58"h posts |
|
for
any 42" high |
mrpl =
64"h posts |
|
for any
48" high |
mrpl =
70"h posts |
|
for
any 54" high |
mrpl =
76"h posts |
|
for any
60" high |
mrpl =
84"h posts |
|
for any
72" high |
mrpl =
100"h posts |
mrpl = minimum
recommended post length
Posts (if necessary) can easily be cut down
on-site during installation
|
|
Posts
will be mounted "on top of a deck" (cement/wood) |
|
for
any 36" high |
mrpl =
58"h posts + Deck Mounts |
|
for
any 42" high |
mrpl =
58"h posts + Deck Mounts |
|
for
any 48" high |
mrpl =
58"h posts + Deck Mounts |
|
for
any 54" high |
mrpl =
58"h posts + Welded Plates |
|
for
any 60" high |
mrpl =
64"h posts + Welded Plates |
|
for any
72" high |
mrpl =
84"h posts + Welded Plates |
mrpl = minimum
recommended post length
Posts used for Deck Applications with Deck
Mounts can be easily cut down on-site. This is
helpful to the installer because it allows YOU
to decide on-site how much CLEARANCE there will
be between the bottom of all the fence panels
and/or gates AND...the ground.
|
|
Posts
will be "core drilled" into an existing deck |
|
for any
36" high |
mrpl =
58"h posts |
|
for
any 42" high |
mrpl =
58"h posts |
|
for
any 48" high |
mrpl =
58"h posts |
|
for any
54" high |
mrpl =
64"h posts |
|
for any
60" high |
mrpl =
84"h posts |
|
for any
72" high |
mrpl =
100"h posts |
mrpl = minimum
recommended post length
Posts (if necessary) can easily be cut down
on-site during installation |
|
Grade 2: Residential WIDE
Aluminum Fence and Gates
(vertical pickets = 1" x
5/8") -
more specs
|
|
Posts
are going "into the ground" |
|
for
any 36" high |
mrpl =
58"h posts |
|
for
any 42" high |
mrpl =
64"h posts |
|
for
any 48" high |
mrpl =
70"h posts |
|
for
any 54" high |
mrpl =
76"h posts |
|
for
any 60" high |
mrpl =
84"h posts |
|
for
any 72" high |
mrpl =
100"h posts |
mrpl = minimum
recommended post length
Posts (if necessary) can easily be cut down
on-site during installation
|
|
Posts
will be mounted "on top of a deck" (cement/wood) |
|
for any
36" high |
mrpl =
58"h posts + Deck Mounts |
|
for any
42" high |
mrpl =
58"h posts + Deck Mounts |
|
for any
48" high |
mrpl =
58"h posts + Deck Mounts |
|
for any
54" high |
mrpl =
58"h posts + Welded Plates |
|
for any
60" high |
mrpl =
64"h posts + Welded Plates |
|
for any
72" high |
mrpl =
84"h posts + Welded Plates |
mrpl = minimum
recommended post length
Posts used for Deck Applications with Deck
Mounts can be easily cut down on-site. This is
helpful to the installer because it allows YOU
to decide on-site how much CLEARANCE there will
be between the bottom of all the fence panels
and/or gates AND...the ground.
|
|
Posts
will be "core drilled" into an existing deck |
|
for any
36" high |
mrpl =
58"h posts |
|
for any
42" high |
mrpl =
58"h posts |
|
for any
48" high |
mrpl =
58"h posts |
|
for any
54" high |
mrpl =
64"h posts |
|
for any
60" high |
mrpl =
84"h posts |
|
for any
72" high |
mrpl =
100"h posts |
mrpl = minimum
recommended post length
Posts (if necessary) can easily be cut down
on-site during installation |
|
| |
| |
Grade 3: COMMERCIAL
Aluminum Fence and Gates
(vertical
pickets = 3/4" x 3/4") -
more specs
|
|
Posts are going "into
the ground" |
|
for any
36"high |
mrpl =
58"h posts |
|
for any
48"high |
mrpl =
70"h posts |
|
for any
54"high |
mrpl =
76"h posts |
|
for any
60"high |
mrpl =
84"h posts |
|
for any
72"high |
mrpl =
100"h posts |
|
for any
84"high |
mrpl =
112"h posts |
|
for any 96"high |
mrpl = 132" posts |
mrpl = minimum
recommended post length
Posts (if necessary) can easily be cut down
on-site during installation
|
|
Posts will be mounted
"on top of a deck"
(cement/wood) |
|
for any
36"high |
mrpl =
58"h posts + Deck Mounts |
|
for any
48"high |
mrpl =
58"h posts + Deck Mounts |
|
for any
54"high |
mrpl =
58"h posts + Welded Plate |
|
for any
60"high |
mrpl =
64"h posts + Welded Plate |
|
for any
72"high |
mrpl =
84"h posts + Welded Plate |
|
for any
84"high |
Better
to go: IN GROUND |
|
for any 96"high |
Better
to go: IN GROUND |
mrpl = minimum
recommended post length
Posts used for Deck Applications with Deck
Mounts can be easily cut down on-site. This is
helpful to the installer because it allows YOU
to decide on-site how much CLEARANCE there will
be between the bottom of all the fence panels
and/or gates AND...the ground.
|
|
Posts will be "core
drilled" into an existing deck |
|
for any
36"high |
mrpl =
58"h posts |
|
for any
48"high |
mrpl =
58"h posts |
|
for any
54"high |
mrpl =
64"h posts |
|
for any
60"high |
mrpl =
84"h posts |
|
for any
72"high |
mrpl =
100"h posts |
|
for any
84"high |
mrpl =
112"h posts |
|
for any 96"high |
mrpl =
132"h posts |
mrpl = minimum
recommended post length
Posts (if necessary) can easily be cut down
on-site during installation
|
|
Grade 4: INDUSTRIAL
Aluminum Fence and Gates
(vertical
pickets = 1" x 1") -
more specs
|
|
Posts are going "into
the ground" |
|
for any
48"high |
mrpl =
70"h posts |
|
for any
60"high |
mrpl =
84"h posts |
|
for any
72"high |
mrpl =
100"h posts |
|
for any
84"high |
mrpl =
112"h posts |
|
for any 96"high |
mrpl = 132" posts |
|
for any
120"high |
Use 13'
long 3x3 posts |
mrpl = minimum
recommended post length
Posts (if necessary) can easily be cut down
on-site during installation
|
|
Posts will be mounted
"on top of a deck" (cement/wood) |
|
for any
48"high |
mrpl =
58"h posts + Deck Mounts |
|
for any
60"high |
mrpl =
64"h posts + Welded Plate |
|
for any
72"high |
mrpl =
84"h posts + Welded Plate |
|
for any
84"high |
Not recommended >
see in ground |
|
for any 96"high |
Not recommended >
see in ground |
|
for any
120"high |
Not
recommended > see in ground |
mrpl = minimum
recommended post length
Posts used for Deck Applications with Deck
Mounts can be easily cut down on-site. This is
helpful to the installer because it allows YOU
to decide on-site how much CLEARANCE there will
be between the bottom of all the fence panels
and/or gates AND...the ground.
|
|
Posts will be "core
drilled" into an existing deck |
|
for any
48"high |
mrpl =
70"h posts |
|
for any
60"high |
mrpl =
84"h posts |
|
for any
72"high |
mrpl =
100"h posts |
|
for any
84"high |
mrpl =
112"h posts |
|
for any 96"high |
mrpl =
132"h posts |
|
for any
120"high |
Use 13'
long 3x3 posts |
mrpl = minimum
recommended post length
Posts (if necessary) can easily be cut down
on-site during installation |
|
Do
not use 2" x 2" posts for Industrial
Grade fencing/gates. 2.5"
x 2.5" posts are the minimum for lines, corners,
ends, blanks, "T"s. 3 x 3 are the minimum
for gate posts. |
|
Important Notes and Tips:
Remember that you always need 2 posts for any Single-Swing Gate OR
Double-Swing gate.
Gate posts can ALSO ACT as line posts or corner posts...if PUNCHED
(Gate-Punched Post). You never need to install 2 posts next to
each other. For DECK applications (where you are using Deck
Mounts) you most likely will have to cut down the post on-site...but
this is very easy to do. Deck Mounts and Welded Plates can be
ordered along with your posts in the POST area of the Online Store.
In regards to Deck Applications, as you move up in height in your fence
choice, you MUST use welded plates in lieu of Deck Mounts.
NEVER use 2.5" posts as GATE posts because the thickness (.075) is not
optimum for Single-Swing Gates or Double-Swing Gates. Many clients who MOVE-UP
to 2.5" line, corner, end, T, blank posts for their project will then
MOVE-UP to 3" x 3" x .125" Gate Posts. These larger posts really
make a visual impact for any fencing project (however, they're NOT
necessary for structural purposes unless you're purchasing an INDUSTRIAL
grade fence and gate system.)
When you purchase Deck Mounts with posts, you (or the installer) will
most likely have to trim down the length of the posts prior to
installation. When you purchase Welded Plates, the plates are
welded on to each post during production and prior to shipment.
Welded Plates are automatically set (punched) to leave 2" of clearance
AFTER fence panel insertion unless otherwise instructed. If you
would like more/less than 2", just let us know how much clearance you
would like on your welded plate-posts.
If
your application requires a combination of welded plate posts with
(let's say) in ground posts....make sure you first install the welded
plate posts because the clearance is set. Then, you can follow
with your in ground posts and match the clearance so that your entire
aluminum fence, gates and horizontal rails....LINE UP. It is
always strongly urged that you read the Installation Manual which can be
downloaded off of this website in EASY INSTALLATION.
For
very large and wide Commercial and Industrial GATES (Single Gates WIDER
than 6' OR Double Gates WIDER than 12') it is strongly recommended to
purchase GATE POSTS that are a little bit longer than the minimum
recommended post length (mrpl) and, sometimes, even larger (like
the 4x4s.).
|
| |
| | |
|
|